Keeping Container-Yard Fleets Moving: Why the 6LA20671 Charger Module Beats New-Build Replacements
Ports and intermodal hubs have embraced electric forklifts and boom lifts for their low emissions and near-silent operation. Yet the very advantage of 24/7 uptime exposes a weak link: charger-module failure. When a module dies at 2 a.m., an entire shift of operators is left idling, and demurrage fees tick upward hour by hour. The fastest, most cost-effective fix isn’t a factory-new board—it’s a remanufactured 6LA20671 charger module that can be swapped in minutes and returned for core credit.
Three reasons remanufactured wins in heavy-throughput yards
- Same-day dispatch vs. 10-week lead times
OEM lead times for specialty charger electronics hover between six and ten weeks. Reman inventory, by contrast, is stocked, tested, and ready to ship the same day—often arriving before the next vessel unloads. Every day shaved off downtime protects contracted turn-time KPIs. - Proven firmware compatibility
Most modern EnerSys and Hawker chargers cycle through firmware versions (212, 211, 181, etc.). Each reman 6LA20671 unit is flashed and bench-tested against every common revision before it leaves the lab. Operators slot it in and resume charging without the “mismatch” error codes that plague gray-market boards. - Core credit lowers true cost of ownership
Electric-fleet managers focus on total lifecycle cost, not sticker price alone. Returning the spent module nets a $350 core refund, bringing the effective investment well below OEM. Combine that with reduced demurrage and labor overtime, and the ROI is immediate—often within a single shift.
Built for container-yard abuse
Reman doesn’t mean “patched-up.” ISO-certified facilities replace all high-heat MOSFETs, inspect solder joints under X-ray, and run each board through a 24-hour thermal cycle. The result: peak charge currents remain stable even in 110 °F Texas summers or sub-freezing Northwest nights.
Speed, sustainability, and supply-chain resilience
Ports win sustainability points by electrifying material-handling equipment; choosing reman parts amplifies that story. Each restored module keeps one kg of copper and eight oz of rare-earth metals in circulation—no additional mining, smelting, or PCB fabrication required.
Need to get a stalled fleet back online tonight? Skip the factory backlog. Order a6LA20671 charger module, claim your core credit, and keep containers—and revenue—flowing.
The post Keeping Container-Yard Fleets Moving: Why the 6LA20671 Charger Module Beats New-Build Replacements appeared first on Container News.
Content Original Link:
" target="_blank">