06
Wed, May

Hai An takes delivery of container vessel GREEN TIME

Container News
Hai An takes delivery of container vessel GREEN TIME

Hai An Green Shipping Lines has officially taken delivery of the container vessel M/V GREEN TIME, further expanding its fleet capacity and strengthening its long-term fleet development strategy.

The delivery and acceptance protocol for the vessel, formerly named M/V Hammonia Baltica, was signed on May 5, 2026, between representatives of Hai An Green Shipping Lines and German partner MS BALTICA OSLO Schiffahrts GmbH & Co. KG.

At the same time, Hai An’s technical and operational teams completed the transfer of vessel management and operations at SEFINE Shipyard in Yalova, Turkey.

Following the completion of legal formalities, the vessel was officially transferred to the ownership of Hai An Green Shipping Lines and renamed M/V GREEN TIME.

The vessel has an overall length of 225.3 metres, a breadth of 29.8 metres and a draft of 11.4 metres. It features a deadweight capacity of 39,164 DWT and can carry up to 2,798 TEU, including 1,112 TEU under deck and 1,686 TEU on deck.

Built in 2011 at Nordic Yard in Germany, the vessel is equipped with a MAN B&W 7L70MC-C main engine with an output of 21,770 kW and a design speed of 22 knots. It is dual-classed by Vietnam Register and Lloyd’s Register.

M/V GREEN TIME becomes the second vessel under Hai An Green Shipping Lines and the 20th vessel owned, managed and operated by the Hai An group. With the addition, the company’s total fleet capacity increases to 33,100 TEU.

Following delivery, the vessel will undergo scheduled maintenance and dry docking at SEFINE Shipyard before continuing operations under a time charter agreement with Maersk on the Mediterranean–West Africa trade route.

Content Original Link:

Original Source CONTAINER NEWS

" target="_blank">

Original Source CONTAINER NEWS

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers

Publishers