14-year production hiatus ends as oil flows into 1998-built FPSO
Following the implementation of a multi-phase revised field development plan (FDP), a 27-year-old floating production, storage, and offloading (FPSO) vessel has enabled the restart of hydrocarbon production at an oil project off the coast of India, which was offline since July 2011.
The post 14-year production hiatus ends as oil flows into 1998-built FPSO appeared first on Offshore Energy.
Content Original Link:
" target="_blank">